Rwanda - Enterprise Survey 2011
Reference ID | RWA_2011_ES_v01_M_WB |
Year | 2011 - 2012 |
Country | Rwanda |
Producer(s) | World Bank |
Sponsor(s) | World Bank - - |
Metadata | Documentation in PDF |
Created on
Jul 20, 2013
Last modified
Aug 12, 2014
Page views
300498
Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year
(c17)
File: Rwanda-2011-full data-
File: Rwanda-2011-full data-
Overview
Type:
Discrete Format: numeric Width: 3 Decimals: 0 Range: -9-480 | Valid cases: 12 Invalid: 229 |
Questions and instructions
How long did these incidents of insufficient water supply last on average?
Value | Category | Cases | |
---|---|---|---|
-9 | do not know | 0 | 0.0% |
1 | less than one hour | 0 | 0.0% |
2 | 2 | 16.7% | |
3 | 1 | 8.3% | |
4 | 1 | 8.3% | |
6 | 2 | 16.7% | |
10 | 1 | 8.3% | |
12 | 2 | 16.7% | |
20 | 1 | 8.3% | |
144 | 1 | 8.3% | |
999 | 1 | 8.3% | |
Sysmiss | 229 |
warning_figures_indicate_number_of_cases_found
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.