Rwanda - Rwanda Labour Force Survery 2023
Reference ID | RWA-NISR-RLFS-2023-v0.1 |
Year | 0 |
Country | Rwanda |
Producer(s) | National Institute of Statistics of Rwanda (NISR) - Ministry of Finance and Economic Planning (MINECOFIN) |
Sponsor(s) | Government of Rwanda - GoR - Funder |
Metadata | Documentation in PDF |
Created on
Mar 25, 2024
Last modified
Mar 25, 2024
Page views
100021
V154
(V154)
File: RW_LFS2023
File: RW_LFS2023
Overview
Type:
Discrete Format: character Width: 57 | Valid cases: 69748 Invalid: 0 |
Value | Category | Cases | |
---|---|---|---|
Bottled Water | 5186 | 7.4% | |
I06B | 1 | 0.0% | |
Other (Specify). | 58 | 0.1% | |
Piped Into Dwelling. | 503 | 0.7% | |
Piped To Yard/Plot | 14020 | 20.1% | |
Protected Spring | 12731 | 18.3% | |
Protected Well | 1670 | 2.4% | |
Public Tap/Standpipe. | 24680 | 35.4% | |
Rainwater. | 1623 | 2.3% | |
Surface Water (River/Lake/Pond/Stream/Irrigation Channel) | 316 | 0.5% | |
Tanker Truck | 43 | 0.1% | |
Tube Well Or Borehole | 1430 | 2.1% | |
Unprotected Spring | 6009 | 8.6% | |
Unprotected Well | 1478 | 2.1% |
warning_figures_indicate_number_of_cases_found