Rwanda - Rwanda Labour Force Survery 2023
Reference ID | RWA-NISR-RLFS-2023-v0.1 |
Year | 0 |
Country | Rwanda |
Producer(s) | National Institute of Statistics of Rwanda (NISR) - Ministry of Finance and Economic Planning (MINECOFIN) |
Sponsor(s) | Government of Rwanda - GoR - Funder |
Metadata | Documentation in PDF |
Created on
Mar 25, 2024
Last modified
Mar 25, 2024
Page views
100073
V153
(V153)
File: RW_LFS2023
File: RW_LFS2023
Overview
Type:
Discrete Format: character Width: 57 | Valid cases: 69748 Invalid: 0 |
Value | Category | Cases | |
---|---|---|---|
Bottled Water | 3052 | 4.4% | |
I06A | 1 | 0.0% | |
Other (Specify). | 56 | 0.1% | |
Piped Into Dwelling. | 332 | 0.5% | |
Piped To Yard/Plot | 11750 | 16.8% | |
Protected Spring | 13801 | 19.8% | |
Protected Well | 1652 | 2.4% | |
Public Tap/Standpipe. | 26964 | 38.7% | |
Rainwater. | 540 | 0.8% | |
Surface Water (River/Lake/Pond/Stream/Irrigation Channel) | 2987 | 4.3% | |
Tanker Truck | 49 | 0.1% | |
Tube Well Or Borehole | 1555 | 2.2% | |
Unprotected Spring | 5834 | 8.4% | |
Unprotected Well | 1175 | 1.7% |
warning_figures_indicate_number_of_cases_found